Summary: Massingir, an earth fill dam with nearly 5 km long and a maximum height of 47 m is the 2nd largest dam in Mozambique. The reservoir has a maximum storage capacity of about 2,800 hm³ and the flooded area, at the Normal Water Level (NWL), is 138 km². Dam construction took place between 1971 and 1977, but because of armed conflict and funding issues, the construction was incomplete, missing the installation of the spillway gates (six gates) and the hydro-power station. During the first filling in 1977 it exhibited serious behaviour problems on the foundation, namely because piping have occurred in large extensions of the right bank dike. Its exploitation was thus, limited, and only after the rehabilitation works completed in 2006, the normal exploitation of the reservoir begun, although still without the power house. The rehabilitation included the following tasks: i) partial treatment of the foundation, by grouting, ii) construction of a stabilizing berm downstream of the dam's right dike, iii) construction of relief wells along the right bank of the dike and the main valley; iv) the lift of 1 m of the crest elevation; v) construction of a concrete parapet on the crest; vi) rehabilitation of the rip-rap; vii) the installation of the spillway gates, viii) repair of hydro-mechanical equipments of the bottom discharges, ix) rehabilitation of the monitoring system and some other minor works. As a result of the re-filling, a major accident occurred at the exit of the bottom outlet discharges, reconditioning again the exploitation of the reservoir. Currently the dam is undergoing a new intervention to increase the capacity of the spillway flood discharges and to repair the bottom outlets exit. The dam has a monitoring system installed, from which several physical quantities are obtained, on the basis of which it is possible to establish statistical models used for assessing its behaviour and to predict its response for different scenarios. Furthermore, the models allow to establish criteria for attention and alert to adopt in future exploration.
id RCAP_ae948210e801ecd5f5ee1c329e597de9
oai_identifier_str oai:localhost:123456789/1003957
network_acronym_str RCAP
network_name_str Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
repository_id_str https://opendoar.ac.uk/repository/7160
spelling Monitoring the behaviour of Massingir dam in MozambiqueFill damAccidentRehabilitationMonitoringMassingir, an earth fill dam with nearly 5 km long and a maximum height of 47 m is the 2nd largest dam in Mozambique. The reservoir has a maximum storage capacity of about 2,800 hm³ and the flooded area, at the Normal Water Level (NWL), is 138 km². Dam construction took place between 1971 and 1977, but because of armed conflict and funding issues, the construction was incomplete, missing the installation of the spillway gates (six gates) and the hydro-power station. During the first filling in 1977 it exhibited serious behaviour problems on the foundation, namely because piping have occurred in large extensions of the right bank dike. Its exploitation was thus, limited, and only after the rehabilitation works completed in 2006, the normal exploitation of the reservoir begun, although still without the power house. The rehabilitation included the following tasks: i) partial treatment of the foundation, by grouting, ii) construction of a stabilizing berm downstream of the dam's right dike, iii) construction of relief wells along the right bank of the dike and the main valley; iv) the lift of 1 m of the crest elevation; v) construction of a concrete parapet on the crest; vi) rehabilitation of the rip-rap; vii) the installation of the spillway gates, viii) repair of hydro-mechanical equipments of the bottom discharges, ix) rehabilitation of the monitoring system and some other minor works. As a result of the re-filling, a major accident occurred at the exit of the bottom outlet discharges, reconditioning again the exploitation of the reservoir. Currently the dam is undergoing a new intervention to increase the capacity of the spillway flood discharges and to repair the bottom outlets exit. The dam has a monitoring system installed, from which several physical quantities are obtained, on the basis of which it is possible to establish statistical models used for assessing its behaviour and to predict its response for different scenarios. Furthermore, the models allow to establish criteria for attention and alert to adopt in future exploration.2012-10-22T09:18:01Z2014-10-10T13:39:29Z2017-04-12T16:07:40Z2012-10-01T00:00:00Z2012-10conference objectinfo:eu-repo/semantics/publishedVersionapplication/pdfhttp://repositorio.lnec.pt:8080/jspui/handle/123456789/1003957engMarcelino, J.Portugal, J. C.info:eu-repo/semantics/openAccessreponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiainstacron:RCAAP2025-05-17T02:58:55Zoai:localhost:123456789/1003957Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireinfo@rcaap.ptopendoar:https://opendoar.ac.uk/repository/71602025-05-29T07:32:49.869665Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiafalse
dc.title.none.fl_str_mv Monitoring the behaviour of Massingir dam in Mozambique
title Monitoring the behaviour of Massingir dam in Mozambique
spellingShingle Monitoring the behaviour of Massingir dam in Mozambique
Marcelino, J.
Fill dam
Accident
Rehabilitation
Monitoring
title_short Monitoring the behaviour of Massingir dam in Mozambique
title_full Monitoring the behaviour of Massingir dam in Mozambique
title_fullStr Monitoring the behaviour of Massingir dam in Mozambique
title_full_unstemmed Monitoring the behaviour of Massingir dam in Mozambique
title_sort Monitoring the behaviour of Massingir dam in Mozambique
author Marcelino, J.
author_facet Marcelino, J.
Portugal, J. C.
author_role author
author2 Portugal, J. C.
author2_role author
dc.contributor.author.fl_str_mv Marcelino, J.
Portugal, J. C.
dc.subject.por.fl_str_mv Fill dam
Accident
Rehabilitation
Monitoring
topic Fill dam
Accident
Rehabilitation
Monitoring
description Massingir, an earth fill dam with nearly 5 km long and a maximum height of 47 m is the 2nd largest dam in Mozambique. The reservoir has a maximum storage capacity of about 2,800 hm³ and the flooded area, at the Normal Water Level (NWL), is 138 km². Dam construction took place between 1971 and 1977, but because of armed conflict and funding issues, the construction was incomplete, missing the installation of the spillway gates (six gates) and the hydro-power station. During the first filling in 1977 it exhibited serious behaviour problems on the foundation, namely because piping have occurred in large extensions of the right bank dike. Its exploitation was thus, limited, and only after the rehabilitation works completed in 2006, the normal exploitation of the reservoir begun, although still without the power house. The rehabilitation included the following tasks: i) partial treatment of the foundation, by grouting, ii) construction of a stabilizing berm downstream of the dam's right dike, iii) construction of relief wells along the right bank of the dike and the main valley; iv) the lift of 1 m of the crest elevation; v) construction of a concrete parapet on the crest; vi) rehabilitation of the rip-rap; vii) the installation of the spillway gates, viii) repair of hydro-mechanical equipments of the bottom discharges, ix) rehabilitation of the monitoring system and some other minor works. As a result of the re-filling, a major accident occurred at the exit of the bottom outlet discharges, reconditioning again the exploitation of the reservoir. Currently the dam is undergoing a new intervention to increase the capacity of the spillway flood discharges and to repair the bottom outlets exit. The dam has a monitoring system installed, from which several physical quantities are obtained, on the basis of which it is possible to establish statistical models used for assessing its behaviour and to predict its response for different scenarios. Furthermore, the models allow to establish criteria for attention and alert to adopt in future exploration.
publishDate 2012
dc.date.none.fl_str_mv 2012-10-22T09:18:01Z
2012-10-01T00:00:00Z
2012-10
2014-10-10T13:39:29Z
2017-04-12T16:07:40Z
dc.type.driver.fl_str_mv conference object
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://repositorio.lnec.pt:8080/jspui/handle/123456789/1003957
url http://repositorio.lnec.pt:8080/jspui/handle/123456789/1003957
dc.language.iso.fl_str_mv eng
language eng
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.source.none.fl_str_mv reponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia
instacron:RCAAP
instname_str FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia
instacron_str RCAAP
institution RCAAP
reponame_str Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
collection Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
repository.name.fl_str_mv Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia
repository.mail.fl_str_mv info@rcaap.pt
_version_ 1833603000792252416