Summary: The Valtorno-Mourão dam in the municipality of Vila Flor is intended to create a reservoir with the total volume of 1.12 x106 m3 for water supply. The embankment has a crest length of 150 m and 32 m of maximum height. It as a homogeneous profile including a sub-vertical filter. The construction of the dam took place between July 2004 and January 2006. During the first filling, the comparison of the results of monitoring with the predictions from the Monitoring Plan lead to the conclusion that the dam was not having the expected behaviour, both for the amount of flow, which was roughly ten times higher than it was expected, and for the pore pressures measured in some piezometers. The Tras-os-Montes region in Portugal has normally severe conditions of water supply and the amount of loss in the dam was not compatible with normal supply to the populations. Given this scenario, it was decided to stop the first filling of the reservoir to allow the diagnosis of deficiencies. As a result, a new grouting treatment of the foundation was made, so that currently, the dam exhibits the desired behaviour. This paper seeks to describe the fundamental characteristics of the dam and foundation, some aspects of the construction, the diagnosis of disabilities, the treatment performed and, finally, the behaviour observed up to the date.
id RCAP_8408c6e6976bdc8f60202d440e901c77
oai_identifier_str oai:localhost:123456789/1003958
network_acronym_str RCAP
network_name_str Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
repository_id_str https://opendoar.ac.uk/repository/7160
spelling Valtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first fillingFill damMonitoringReinforcementFirst fillingThe Valtorno-Mourão dam in the municipality of Vila Flor is intended to create a reservoir with the total volume of 1.12 x106 m3 for water supply. The embankment has a crest length of 150 m and 32 m of maximum height. It as a homogeneous profile including a sub-vertical filter. The construction of the dam took place between July 2004 and January 2006. During the first filling, the comparison of the results of monitoring with the predictions from the Monitoring Plan lead to the conclusion that the dam was not having the expected behaviour, both for the amount of flow, which was roughly ten times higher than it was expected, and for the pore pressures measured in some piezometers. The Tras-os-Montes region in Portugal has normally severe conditions of water supply and the amount of loss in the dam was not compatible with normal supply to the populations. Given this scenario, it was decided to stop the first filling of the reservoir to allow the diagnosis of deficiencies. As a result, a new grouting treatment of the foundation was made, so that currently, the dam exhibits the desired behaviour. This paper seeks to describe the fundamental characteristics of the dam and foundation, some aspects of the construction, the diagnosis of disabilities, the treatment performed and, finally, the behaviour observed up to the date.2012-10-22T09:19:44Z2014-10-10T13:39:31Z2017-04-13T12:11:01Z2012-10-01T00:00:00Z2012-10conference objectinfo:eu-repo/semantics/publishedVersionapplication/pdfhttp://repositorio.lnec.pt:8080/jspui/handle/123456789/1003958engMarcelino, J.Paixão, J. B.info:eu-repo/semantics/openAccessreponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiainstacron:RCAAP2025-05-17T03:01:23Zoai:localhost:123456789/1003958Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireinfo@rcaap.ptopendoar:https://opendoar.ac.uk/repository/71602025-05-29T07:34:59.842855Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiafalse
dc.title.none.fl_str_mv Valtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first filling
title Valtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first filling
spellingShingle Valtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first filling
Marcelino, J.
Fill dam
Monitoring
Reinforcement
First filling
title_short Valtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first filling
title_full Valtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first filling
title_fullStr Valtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first filling
title_full_unstemmed Valtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first filling
title_sort Valtorno-Mourão Dam. Reinforcement of the foundation grout due to problems detected during the first filling
author Marcelino, J.
author_facet Marcelino, J.
Paixão, J. B.
author_role author
author2 Paixão, J. B.
author2_role author
dc.contributor.author.fl_str_mv Marcelino, J.
Paixão, J. B.
dc.subject.por.fl_str_mv Fill dam
Monitoring
Reinforcement
First filling
topic Fill dam
Monitoring
Reinforcement
First filling
description The Valtorno-Mourão dam in the municipality of Vila Flor is intended to create a reservoir with the total volume of 1.12 x106 m3 for water supply. The embankment has a crest length of 150 m and 32 m of maximum height. It as a homogeneous profile including a sub-vertical filter. The construction of the dam took place between July 2004 and January 2006. During the first filling, the comparison of the results of monitoring with the predictions from the Monitoring Plan lead to the conclusion that the dam was not having the expected behaviour, both for the amount of flow, which was roughly ten times higher than it was expected, and for the pore pressures measured in some piezometers. The Tras-os-Montes region in Portugal has normally severe conditions of water supply and the amount of loss in the dam was not compatible with normal supply to the populations. Given this scenario, it was decided to stop the first filling of the reservoir to allow the diagnosis of deficiencies. As a result, a new grouting treatment of the foundation was made, so that currently, the dam exhibits the desired behaviour. This paper seeks to describe the fundamental characteristics of the dam and foundation, some aspects of the construction, the diagnosis of disabilities, the treatment performed and, finally, the behaviour observed up to the date.
publishDate 2012
dc.date.none.fl_str_mv 2012-10-22T09:19:44Z
2012-10-01T00:00:00Z
2012-10
2014-10-10T13:39:31Z
2017-04-13T12:11:01Z
dc.type.driver.fl_str_mv conference object
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
status_str publishedVersion
dc.identifier.uri.fl_str_mv http://repositorio.lnec.pt:8080/jspui/handle/123456789/1003958
url http://repositorio.lnec.pt:8080/jspui/handle/123456789/1003958
dc.language.iso.fl_str_mv eng
language eng
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.source.none.fl_str_mv reponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia
instacron:RCAAP
instname_str FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia
instacron_str RCAAP
institution RCAAP
reponame_str Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
collection Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
repository.name.fl_str_mv Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia
repository.mail.fl_str_mv info@rcaap.pt
_version_ 1833603009838317568