Procedimentos e projeto de demolições para edificações em concreto armado

Detalhes bibliográficos
Ano de defesa: 2019
Autor(a) principal: Martins, Pedro Henrique Santos
Orientador(a): Almeida Filho, Fernando Menezes de lattes
Banca de defesa: Não Informado pela instituição
Tipo de documento: Dissertação
Tipo de acesso: Acesso aberto
Idioma: por
Instituição de defesa: Universidade Federal de São Carlos
Câmpus São Carlos
Programa de Pós-Graduação: Programa de Pós-Graduação em Engenharia Civil - PPGECiv
Departamento: Não Informado pela instituição
País: Não Informado pela instituição
Palavras-chave em Português:
Palavras-chave em Inglês:
Área do conhecimento CNPq:
Link de acesso: https://repositorio.ufscar.br/handle/20.500.14289/11665
Resumo: Demolition is the process of planned fragmentation of elements of construction that can be total, representing the ruin of the building, or partial, occurred in reforms and structural changes. However, it is considered as a risk activity, as it is often affected structural elements, and consequently, the static behavior of the building, and the study of the demolition project and controlled collapse is left without specific criteria. This research features a study of national and international standards, guidelines and code of practices that discuss the project and the useful techniques for demolition of reinforced concrete structures. In Brazil, the demolition is executed through empirical methods and often without technical safeguard, since the Brazilian norm that regulated the contracting and offered guidelines for the execution of demolition services was canceled. Therefore, were presented a study of the Brazilian norm canceled and standards of other countries, showing their differences and procedures, as well as the main current techniques, such as: manual, mechanical, wire rope pulling demolition, by explosives, wrecking ball, chemical demolition, thermal procedures and by hydrodemolition with pressure jet. Therefore, the different techniques are presented, the considerations for project and execution of demolitions and examples of projects applications, which is presented and discussed the planning criteria. The decision of the most appropriate method should be made by evaluating the factors of restriction, cost, availability of equipment and access, distance of neighboring buildings, the state of the structure and meteorological conditions. Thus, according to what was observed, it was concluded that a preliminary adequacy of the building to be demolished is important, to consider the most efficient and effective method in its correct dismantling and disposal of the waste generated.