Summary: The construction sector is one of the engines of the economy of the country, and its products are highly dependent on labor, and that your time has big share in costs related to the construction process. In this sense, companies began to seek ways to minimize the cost of workers, by means of outsourcing of services or strategies to increase the productivity of the workforce itself. The aim of this study was to compare the costs of different forms of contract labour. To do this, we conducted a case study applied to a hypothetical residential condominium, composed of eight 54 residences, 88 m ², from which three simulations were performed in order to obtain the cost for hiring labor, contract global and per task. The value for first simulation was obtained from the schedule of work, through which determined the number of teams and the time of execution of the work, which served as parameters for determining the cost of payroll. Already the cost to global contract job, was obtained from quotes made with contractors, who provided the total amount collected for execution. Finally, the cost for hiring by task was obtained from the quotations of certain services, along with a detailed budget held the TCPO and SINAPI. The results show that the cost for hiring of labour for global enterprise presented a 105.315% lower cost than the cost of hiring labor, 28.62% lower and that hiring by task. However, points out that during the recruitment of the global contract job, can occur from the contractor not to count on labor, so as not to collect taxes, so harmful to workers, who are destitute of benefits assets.
id UTFPR-12_0c67b6dd16fe6a7aefcec4af395d56af
oai_identifier_str oai:repositorio.utfpr.edu.br:1/24668
network_acronym_str UTFPR-12
network_name_str Repositório Institucional da UTFPR (da Universidade Tecnológica Federal do Paraná (RIUT))
repository_id_str
spelling O impacto da forma de contratação no custo da mão de obraThe impact of the form of contracting at the cost of laborProdutividade do trabalhoPlanejamento de mão-de-obraConstrução civil - EstimativasLabor productivityManpower planningBuilding - EstimatesCNPQ::ENGENHARIAS::ENGENHARIA CIVILThe construction sector is one of the engines of the economy of the country, and its products are highly dependent on labor, and that your time has big share in costs related to the construction process. In this sense, companies began to seek ways to minimize the cost of workers, by means of outsourcing of services or strategies to increase the productivity of the workforce itself. The aim of this study was to compare the costs of different forms of contract labour. To do this, we conducted a case study applied to a hypothetical residential condominium, composed of eight 54 residences, 88 m ², from which three simulations were performed in order to obtain the cost for hiring labor, contract global and per task. The value for first simulation was obtained from the schedule of work, through which determined the number of teams and the time of execution of the work, which served as parameters for determining the cost of payroll. Already the cost to global contract job, was obtained from quotes made with contractors, who provided the total amount collected for execution. Finally, the cost for hiring by task was obtained from the quotations of certain services, along with a detailed budget held the TCPO and SINAPI. The results show that the cost for hiring of labour for global enterprise presented a 105.315% lower cost than the cost of hiring labor, 28.62% lower and that hiring by task. However, points out that during the recruitment of the global contract job, can occur from the contractor not to count on labor, so as not to collect taxes, so harmful to workers, who are destitute of benefits assets.O setor da construção civil é um dos motores da economia do país, sendo que seus produtos são altamente dependentes de mão de obra, e essa por sua vez tem grande participação nos custos relacionados ao processo construtivo. Neste sentido, as empresas passaram a buscar formas de minimizar os custos com os trabalhadores, seja por meio da terceirização de serviços ou estratégias para aumento da produtividade da mão de obra própria. O objetivo deste trabalho foi comparar os custos de diferentes formas de contratação da mão de obra. Para isso, foi realizado um estudo de caso aplicado a um condomínio residencial hipotético, composto por oito residências de 54,88m², a partir do qual foram realizadas três simulações a fim de obter o custo para contratação de mão de obra registrada, empreitada global e contratação por tarefa. O valor para a primeira simulação foi obtido a partir da elaboração da programação de obra, por meio da qual se determinou o número de equipes de trabalho e o tempo de execução da obra, que serviram de parâmetros para determinação do custo da folha de pagamento. O custo para empreitada global, foi obtido a partir de cotações realizadas com empreiteiros, que forneceram o valor total cobrado para execução do condomínio. Por fim, o custo para contratação por tarefa foi obtido a partir de cotações de determinados serviços, juntamente com um orçamento detalhado realizado com auxílio da TCPO e SINAPI. Os resultados demonstram que a contratação da mão de obra por empreitada global apresentou um custo 105,315% menor do que o custo para contratação da mão de obra registrada, e 28,62% menor que a contratação por tarefa. Porém, destaca-se que durante a contratação da empreitada global, o empreiteiro pode não contar com mão de obra registrada, de forma a não recolher os encargos, sendo assim prejudicial aos trabalhadores, que ficam desamparados de benefícios previdenciários.Universidade Tecnológica Federal do ParanáToledoBrasilEngenharia CivilUTFPRBressiani, LuciaPinela, Sandra Regina da SilvaFurlan, Gladis CristinaBressiani, LuciaSgarbossa, Ricardo2021-04-07T12:45:15Z2021-04-07T12:45:15Z2019-06-03info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesisapplication/pdfSGARBOSSA, Ricardo. O impacto da forma de contratação no custo da mão de obra. 2019. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Universidade Tecnológica Federal do Paraná, Toledo, 2019.http://repositorio.utfpr.edu.br/jspui/handle/1/24668porinfo:eu-repo/semantics/openAccessreponame:Repositório Institucional da UTFPR (da Universidade Tecnológica Federal do Paraná (RIUT))instname:Universidade Tecnológica Federal do Paraná (UTFPR)instacron:UTFPR2021-04-08T06:11:53Zoai:repositorio.utfpr.edu.br:1/24668Repositório InstitucionalPUBhttp://repositorio.utfpr.edu.br:8080/oai/requestriut@utfpr.edu.bropendoar:2021-04-08T06:11:53Repositório Institucional da UTFPR (da Universidade Tecnológica Federal do Paraná (RIUT)) - Universidade Tecnológica Federal do Paraná (UTFPR)false
dc.title.none.fl_str_mv O impacto da forma de contratação no custo da mão de obra
The impact of the form of contracting at the cost of labor
title O impacto da forma de contratação no custo da mão de obra
spellingShingle O impacto da forma de contratação no custo da mão de obra
Sgarbossa, Ricardo
Produtividade do trabalho
Planejamento de mão-de-obra
Construção civil - Estimativas
Labor productivity
Manpower planning
Building - Estimates
CNPQ::ENGENHARIAS::ENGENHARIA CIVIL
title_short O impacto da forma de contratação no custo da mão de obra
title_full O impacto da forma de contratação no custo da mão de obra
title_fullStr O impacto da forma de contratação no custo da mão de obra
title_full_unstemmed O impacto da forma de contratação no custo da mão de obra
title_sort O impacto da forma de contratação no custo da mão de obra
author Sgarbossa, Ricardo
author_facet Sgarbossa, Ricardo
author_role author
dc.contributor.none.fl_str_mv Bressiani, Lucia
Pinela, Sandra Regina da Silva
Furlan, Gladis Cristina
Bressiani, Lucia
dc.contributor.author.fl_str_mv Sgarbossa, Ricardo
dc.subject.por.fl_str_mv Produtividade do trabalho
Planejamento de mão-de-obra
Construção civil - Estimativas
Labor productivity
Manpower planning
Building - Estimates
CNPQ::ENGENHARIAS::ENGENHARIA CIVIL
topic Produtividade do trabalho
Planejamento de mão-de-obra
Construção civil - Estimativas
Labor productivity
Manpower planning
Building - Estimates
CNPQ::ENGENHARIAS::ENGENHARIA CIVIL
description The construction sector is one of the engines of the economy of the country, and its products are highly dependent on labor, and that your time has big share in costs related to the construction process. In this sense, companies began to seek ways to minimize the cost of workers, by means of outsourcing of services or strategies to increase the productivity of the workforce itself. The aim of this study was to compare the costs of different forms of contract labour. To do this, we conducted a case study applied to a hypothetical residential condominium, composed of eight 54 residences, 88 m ², from which three simulations were performed in order to obtain the cost for hiring labor, contract global and per task. The value for first simulation was obtained from the schedule of work, through which determined the number of teams and the time of execution of the work, which served as parameters for determining the cost of payroll. Already the cost to global contract job, was obtained from quotes made with contractors, who provided the total amount collected for execution. Finally, the cost for hiring by task was obtained from the quotations of certain services, along with a detailed budget held the TCPO and SINAPI. The results show that the cost for hiring of labour for global enterprise presented a 105.315% lower cost than the cost of hiring labor, 28.62% lower and that hiring by task. However, points out that during the recruitment of the global contract job, can occur from the contractor not to count on labor, so as not to collect taxes, so harmful to workers, who are destitute of benefits assets.
publishDate 2019
dc.date.none.fl_str_mv 2019-06-03
2021-04-07T12:45:15Z
2021-04-07T12:45:15Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/bachelorThesis
format bachelorThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv SGARBOSSA, Ricardo. O impacto da forma de contratação no custo da mão de obra. 2019. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Universidade Tecnológica Federal do Paraná, Toledo, 2019.
http://repositorio.utfpr.edu.br/jspui/handle/1/24668
identifier_str_mv SGARBOSSA, Ricardo. O impacto da forma de contratação no custo da mão de obra. 2019. Trabalho de Conclusão de Curso (Bacharelado em Engenharia Civil) - Universidade Tecnológica Federal do Paraná, Toledo, 2019.
url http://repositorio.utfpr.edu.br/jspui/handle/1/24668
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidade Tecnológica Federal do Paraná
Toledo
Brasil
Engenharia Civil
UTFPR
publisher.none.fl_str_mv Universidade Tecnológica Federal do Paraná
Toledo
Brasil
Engenharia Civil
UTFPR
dc.source.none.fl_str_mv reponame:Repositório Institucional da UTFPR (da Universidade Tecnológica Federal do Paraná (RIUT))
instname:Universidade Tecnológica Federal do Paraná (UTFPR)
instacron:UTFPR
instname_str Universidade Tecnológica Federal do Paraná (UTFPR)
instacron_str UTFPR
institution UTFPR
reponame_str Repositório Institucional da UTFPR (da Universidade Tecnológica Federal do Paraná (RIUT))
collection Repositório Institucional da UTFPR (da Universidade Tecnológica Federal do Paraná (RIUT))
repository.name.fl_str_mv Repositório Institucional da UTFPR (da Universidade Tecnológica Federal do Paraná (RIUT)) - Universidade Tecnológica Federal do Paraná (UTFPR)
repository.mail.fl_str_mv riut@utfpr.edu.br
_version_ 1834836417071546368