Heuristic algorithm to solve the short term transmission network expansion planning
Main Author: | |
---|---|
Publication Date: | 2007 |
Other Authors: | , , |
Format: | Conference object |
Language: | eng |
Source: | Repositório Institucional da UNESP |
Download full: | http://dx.doi.org/10.1109/PES.2007.385441 http://hdl.handle.net/11449/70028 |
Summary: | In this paper, a method for solving the short term transmission network expansion planning problem is presented. This is a very complex mixed integer nonlinear programming problem that presents a combinatorial explosion in the search space. In order to And a solution of excellent quality for this problem, a constructive heuristic algorithm is presented in this paper. In each step of the algorithm, a sensitivity index is used to add a circuit (transmission line or transformer) or a capacitor bank (fixed or variable) to the system. This sensitivity index is obtained solving the problem considering the numbers of circuits and capacitors banks to be added (relaxed problem), as continuous variables. The relaxed problem is a large and complex nonlinear programming and was solved through a higher order interior point method. The paper shows results of several tests that were performed using three well-known electric energy systems in order to show the possibility and the advantages of using the AC model. ©2007 IEEE. |
id |
UNSP_7c7648c5bc13b23bcd281dfdf5cd289c |
---|---|
oai_identifier_str |
oai:repositorio.unesp.br:11449/70028 |
network_acronym_str |
UNSP |
network_name_str |
Repositório Institucional da UNESP |
repository_id_str |
2946 |
spelling |
Heuristic algorithm to solve the short term transmission network expansion planningAC modelConstructive heuristic algorithmsMixed integer nonlinear programmingTransmission network expansion planningCapacitorsHeuristic algorithmsInteger programmingMathematical modelsNonlinear programmingPlanningProblem solvingSensitivity analysisElectric power transmission networksIn this paper, a method for solving the short term transmission network expansion planning problem is presented. This is a very complex mixed integer nonlinear programming problem that presents a combinatorial explosion in the search space. In order to And a solution of excellent quality for this problem, a constructive heuristic algorithm is presented in this paper. In each step of the algorithm, a sensitivity index is used to add a circuit (transmission line or transformer) or a capacitor bank (fixed or variable) to the system. This sensitivity index is obtained solving the problem considering the numbers of circuits and capacitors banks to be added (relaxed problem), as continuous variables. The relaxed problem is a large and complex nonlinear programming and was solved through a higher order interior point method. The paper shows results of several tests that were performed using three well-known electric energy systems in order to show the possibility and the advantages of using the AC model. ©2007 IEEE.IEEEDepartment of Electric Energy Systems State University of Campinas, Campinas - SPElectrical Engineering Department of Ilha Solteira Paulista State University, Ilha Solteira - SPElectrical Engineering Department of Ilha Solteira Paulista State University, Ilha Solteira - SPIEEEUniversidade Estadual de Campinas (UNICAMP)Universidade Estadual Paulista (Unesp)Rider, Marcos J.Gallego, Luis A. [UNESP]Romero, Rubén [UNESP]García, Ariovaldo V.2014-05-27T11:22:39Z2014-05-27T11:22:39Z2007-12-01info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/conferenceObjecthttp://dx.doi.org/10.1109/PES.2007.3854412007 IEEE Power Engineering Society General Meeting, PES.http://hdl.handle.net/11449/7002810.1109/PES.2007.3854412-s2.0-42549117585Scopusreponame:Repositório Institucional da UNESPinstname:Universidade Estadual Paulista (UNESP)instacron:UNESPeng2007 IEEE Power Engineering Society General Meeting, PESinfo:eu-repo/semantics/openAccess2024-07-04T19:11:33Zoai:repositorio.unesp.br:11449/70028Repositório InstitucionalPUBhttp://repositorio.unesp.br/oai/requestrepositoriounesp@unesp.bropendoar:29462024-07-04T19:11:33Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP)false |
dc.title.none.fl_str_mv |
Heuristic algorithm to solve the short term transmission network expansion planning |
title |
Heuristic algorithm to solve the short term transmission network expansion planning |
spellingShingle |
Heuristic algorithm to solve the short term transmission network expansion planning Rider, Marcos J. AC model Constructive heuristic algorithms Mixed integer nonlinear programming Transmission network expansion planning Capacitors Heuristic algorithms Integer programming Mathematical models Nonlinear programming Planning Problem solving Sensitivity analysis Electric power transmission networks |
title_short |
Heuristic algorithm to solve the short term transmission network expansion planning |
title_full |
Heuristic algorithm to solve the short term transmission network expansion planning |
title_fullStr |
Heuristic algorithm to solve the short term transmission network expansion planning |
title_full_unstemmed |
Heuristic algorithm to solve the short term transmission network expansion planning |
title_sort |
Heuristic algorithm to solve the short term transmission network expansion planning |
author |
Rider, Marcos J. |
author_facet |
Rider, Marcos J. Gallego, Luis A. [UNESP] Romero, Rubén [UNESP] García, Ariovaldo V. |
author_role |
author |
author2 |
Gallego, Luis A. [UNESP] Romero, Rubén [UNESP] García, Ariovaldo V. |
author2_role |
author author author |
dc.contributor.none.fl_str_mv |
IEEE Universidade Estadual de Campinas (UNICAMP) Universidade Estadual Paulista (Unesp) |
dc.contributor.author.fl_str_mv |
Rider, Marcos J. Gallego, Luis A. [UNESP] Romero, Rubén [UNESP] García, Ariovaldo V. |
dc.subject.por.fl_str_mv |
AC model Constructive heuristic algorithms Mixed integer nonlinear programming Transmission network expansion planning Capacitors Heuristic algorithms Integer programming Mathematical models Nonlinear programming Planning Problem solving Sensitivity analysis Electric power transmission networks |
topic |
AC model Constructive heuristic algorithms Mixed integer nonlinear programming Transmission network expansion planning Capacitors Heuristic algorithms Integer programming Mathematical models Nonlinear programming Planning Problem solving Sensitivity analysis Electric power transmission networks |
description |
In this paper, a method for solving the short term transmission network expansion planning problem is presented. This is a very complex mixed integer nonlinear programming problem that presents a combinatorial explosion in the search space. In order to And a solution of excellent quality for this problem, a constructive heuristic algorithm is presented in this paper. In each step of the algorithm, a sensitivity index is used to add a circuit (transmission line or transformer) or a capacitor bank (fixed or variable) to the system. This sensitivity index is obtained solving the problem considering the numbers of circuits and capacitors banks to be added (relaxed problem), as continuous variables. The relaxed problem is a large and complex nonlinear programming and was solved through a higher order interior point method. The paper shows results of several tests that were performed using three well-known electric energy systems in order to show the possibility and the advantages of using the AC model. ©2007 IEEE. |
publishDate |
2007 |
dc.date.none.fl_str_mv |
2007-12-01 2014-05-27T11:22:39Z 2014-05-27T11:22:39Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/conferenceObject |
format |
conferenceObject |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
http://dx.doi.org/10.1109/PES.2007.385441 2007 IEEE Power Engineering Society General Meeting, PES. http://hdl.handle.net/11449/70028 10.1109/PES.2007.385441 2-s2.0-42549117585 |
url |
http://dx.doi.org/10.1109/PES.2007.385441 http://hdl.handle.net/11449/70028 |
identifier_str_mv |
2007 IEEE Power Engineering Society General Meeting, PES. 10.1109/PES.2007.385441 2-s2.0-42549117585 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
2007 IEEE Power Engineering Society General Meeting, PES |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.source.none.fl_str_mv |
Scopus reponame:Repositório Institucional da UNESP instname:Universidade Estadual Paulista (UNESP) instacron:UNESP |
instname_str |
Universidade Estadual Paulista (UNESP) |
instacron_str |
UNESP |
institution |
UNESP |
reponame_str |
Repositório Institucional da UNESP |
collection |
Repositório Institucional da UNESP |
repository.name.fl_str_mv |
Repositório Institucional da UNESP - Universidade Estadual Paulista (UNESP) |
repository.mail.fl_str_mv |
repositoriounesp@unesp.br |
_version_ |
1834484268290539520 |