An integer linear programming model for the multiperiod production planning of precast concrete beams

Bibliographic Details
Main Author: Prata, Bruno de Athayde
Publication Date: 2015
Other Authors: Pitombeira Neto, Anselmo Ramalho, Sales, Caio Jucá de Moraes
Format: Article
Language: eng
Source: Repositório Institucional da Universidade Federal do Ceará (UFC)
dARK ID: ark:/83112/001300002msfx
Download full: http://www.repositorio.ufc.br/handle/riufc/71983
Summary: Unlike conventional beams, which are cast in the construction site, precast beams are cast in a production line in a beam factory.Their use may considerably reduce the completion time of construction projects, making them attractive to public housing. A key factor forthe success of their use is the ability of efficiently producing them, which depends on the quality of the production planning. The objective ofthis paper is to propose an integer linear programming model for the precast concrete beams production problem. It is first shown that thisproblem is isomorphic to the well-known multiperiod cutting stock problem. The objective function is the minimization of the production lossof a production order, subject to the available capacity of forms used to cast the beams. A case study is presented with data of a real scaleinstance, so as to demonstrate the applicability of the model in industrial settings. The proposed model was implemented and ran on theCPLEX solver, which reached an optimal solution within an acceptable running time. The results indicate that significant gains may beachieved in terms of reduction of planning time through the application of the proposed model.
id UFC-7_c750e6e1887b5921848b367050c79f72
oai_identifier_str oai:repositorio.ufc.br:riufc/71983
network_acronym_str UFC-7
network_name_str Repositório Institucional da Universidade Federal do Ceará (UFC)
repository_id_str
spelling An integer linear programming model for the multiperiod production planning of precast concrete beamsPrecast concrete beamsProduction planningInteger linear programmingQuantitative methodsUnlike conventional beams, which are cast in the construction site, precast beams are cast in a production line in a beam factory.Their use may considerably reduce the completion time of construction projects, making them attractive to public housing. A key factor forthe success of their use is the ability of efficiently producing them, which depends on the quality of the production planning. The objective ofthis paper is to propose an integer linear programming model for the precast concrete beams production problem. It is first shown that thisproblem is isomorphic to the well-known multiperiod cutting stock problem. The objective function is the minimization of the production lossof a production order, subject to the available capacity of forms used to cast the beams. A case study is presented with data of a real scaleinstance, so as to demonstrate the applicability of the model in industrial settings. The proposed model was implemented and ran on theCPLEX solver, which reached an optimal solution within an acceptable running time. The results indicate that significant gains may beachieved in terms of reduction of planning time through the application of the proposed model.Journal of Construction Engineering and Management2023-05-02T15:43:35Z2023-05-02T15:43:35Z2015info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfPRATA, Bruno de Athayde; PITOMBEIRA NETO, Anselmo Ramalho; SALES, Caio Jucá de Moraes. An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, [S. l.], v. 141, n. 10, p. 04015029-1-4, 2015.1943-7862http://www.repositorio.ufc.br/handle/riufc/71983ark:/83112/001300002msfxPrata, Bruno de AthaydePitombeira Neto, Anselmo RamalhoSales, Caio Jucá de Moraesinfo:eu-repo/semantics/openAccessengreponame:Repositório Institucional da Universidade Federal do Ceará (UFC)instname:Universidade Federal do Ceará (UFC)instacron:UFC2023-12-07T17:04:15Zoai:repositorio.ufc.br:riufc/71983Repositório InstitucionalPUBhttp://www.repositorio.ufc.br/ri-oai/requestbu@ufc.br || repositorio@ufc.bropendoar:2023-12-07T17:04:15Repositório Institucional da Universidade Federal do Ceará (UFC) - Universidade Federal do Ceará (UFC)false
dc.title.none.fl_str_mv An integer linear programming model for the multiperiod production planning of precast concrete beams
title An integer linear programming model for the multiperiod production planning of precast concrete beams
spellingShingle An integer linear programming model for the multiperiod production planning of precast concrete beams
Prata, Bruno de Athayde
Precast concrete beams
Production planning
Integer linear programming
Quantitative methods
title_short An integer linear programming model for the multiperiod production planning of precast concrete beams
title_full An integer linear programming model for the multiperiod production planning of precast concrete beams
title_fullStr An integer linear programming model for the multiperiod production planning of precast concrete beams
title_full_unstemmed An integer linear programming model for the multiperiod production planning of precast concrete beams
title_sort An integer linear programming model for the multiperiod production planning of precast concrete beams
author Prata, Bruno de Athayde
author_facet Prata, Bruno de Athayde
Pitombeira Neto, Anselmo Ramalho
Sales, Caio Jucá de Moraes
author_role author
author2 Pitombeira Neto, Anselmo Ramalho
Sales, Caio Jucá de Moraes
author2_role author
author
dc.contributor.author.fl_str_mv Prata, Bruno de Athayde
Pitombeira Neto, Anselmo Ramalho
Sales, Caio Jucá de Moraes
dc.subject.por.fl_str_mv Precast concrete beams
Production planning
Integer linear programming
Quantitative methods
topic Precast concrete beams
Production planning
Integer linear programming
Quantitative methods
description Unlike conventional beams, which are cast in the construction site, precast beams are cast in a production line in a beam factory.Their use may considerably reduce the completion time of construction projects, making them attractive to public housing. A key factor forthe success of their use is the ability of efficiently producing them, which depends on the quality of the production planning. The objective ofthis paper is to propose an integer linear programming model for the precast concrete beams production problem. It is first shown that thisproblem is isomorphic to the well-known multiperiod cutting stock problem. The objective function is the minimization of the production lossof a production order, subject to the available capacity of forms used to cast the beams. A case study is presented with data of a real scaleinstance, so as to demonstrate the applicability of the model in industrial settings. The proposed model was implemented and ran on theCPLEX solver, which reached an optimal solution within an acceptable running time. The results indicate that significant gains may beachieved in terms of reduction of planning time through the application of the proposed model.
publishDate 2015
dc.date.none.fl_str_mv 2015
2023-05-02T15:43:35Z
2023-05-02T15:43:35Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/article
format article
status_str publishedVersion
dc.identifier.uri.fl_str_mv PRATA, Bruno de Athayde; PITOMBEIRA NETO, Anselmo Ramalho; SALES, Caio Jucá de Moraes. An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, [S. l.], v. 141, n. 10, p. 04015029-1-4, 2015.
1943-7862
http://www.repositorio.ufc.br/handle/riufc/71983
dc.identifier.dark.fl_str_mv ark:/83112/001300002msfx
identifier_str_mv PRATA, Bruno de Athayde; PITOMBEIRA NETO, Anselmo Ramalho; SALES, Caio Jucá de Moraes. An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, [S. l.], v. 141, n. 10, p. 04015029-1-4, 2015.
1943-7862
ark:/83112/001300002msfx
url http://www.repositorio.ufc.br/handle/riufc/71983
dc.language.iso.fl_str_mv eng
language eng
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Journal of Construction Engineering and Management
publisher.none.fl_str_mv Journal of Construction Engineering and Management
dc.source.none.fl_str_mv reponame:Repositório Institucional da Universidade Federal do Ceará (UFC)
instname:Universidade Federal do Ceará (UFC)
instacron:UFC
instname_str Universidade Federal do Ceará (UFC)
instacron_str UFC
institution UFC
reponame_str Repositório Institucional da Universidade Federal do Ceará (UFC)
collection Repositório Institucional da Universidade Federal do Ceará (UFC)
repository.name.fl_str_mv Repositório Institucional da Universidade Federal do Ceará (UFC) - Universidade Federal do Ceará (UFC)
repository.mail.fl_str_mv bu@ufc.br || repositorio@ufc.br
_version_ 1834207761035952128