An integer linear programming model for the multiperiod production planning of precast concrete beams
Main Author: | |
---|---|
Publication Date: | 2015 |
Other Authors: | , |
Format: | Article |
Language: | eng |
Source: | Repositório Institucional da Universidade Federal do Ceará (UFC) |
dARK ID: | ark:/83112/001300002msfx |
Download full: | http://www.repositorio.ufc.br/handle/riufc/71983 |
Summary: | Unlike conventional beams, which are cast in the construction site, precast beams are cast in a production line in a beam factory.Their use may considerably reduce the completion time of construction projects, making them attractive to public housing. A key factor forthe success of their use is the ability of efficiently producing them, which depends on the quality of the production planning. The objective ofthis paper is to propose an integer linear programming model for the precast concrete beams production problem. It is first shown that thisproblem is isomorphic to the well-known multiperiod cutting stock problem. The objective function is the minimization of the production lossof a production order, subject to the available capacity of forms used to cast the beams. A case study is presented with data of a real scaleinstance, so as to demonstrate the applicability of the model in industrial settings. The proposed model was implemented and ran on theCPLEX solver, which reached an optimal solution within an acceptable running time. The results indicate that significant gains may beachieved in terms of reduction of planning time through the application of the proposed model. |
id |
UFC-7_c750e6e1887b5921848b367050c79f72 |
---|---|
oai_identifier_str |
oai:repositorio.ufc.br:riufc/71983 |
network_acronym_str |
UFC-7 |
network_name_str |
Repositório Institucional da Universidade Federal do Ceará (UFC) |
repository_id_str |
|
spelling |
An integer linear programming model for the multiperiod production planning of precast concrete beamsPrecast concrete beamsProduction planningInteger linear programmingQuantitative methodsUnlike conventional beams, which are cast in the construction site, precast beams are cast in a production line in a beam factory.Their use may considerably reduce the completion time of construction projects, making them attractive to public housing. A key factor forthe success of their use is the ability of efficiently producing them, which depends on the quality of the production planning. The objective ofthis paper is to propose an integer linear programming model for the precast concrete beams production problem. It is first shown that thisproblem is isomorphic to the well-known multiperiod cutting stock problem. The objective function is the minimization of the production lossof a production order, subject to the available capacity of forms used to cast the beams. A case study is presented with data of a real scaleinstance, so as to demonstrate the applicability of the model in industrial settings. The proposed model was implemented and ran on theCPLEX solver, which reached an optimal solution within an acceptable running time. The results indicate that significant gains may beachieved in terms of reduction of planning time through the application of the proposed model.Journal of Construction Engineering and Management2023-05-02T15:43:35Z2023-05-02T15:43:35Z2015info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articleapplication/pdfPRATA, Bruno de Athayde; PITOMBEIRA NETO, Anselmo Ramalho; SALES, Caio Jucá de Moraes. An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, [S. l.], v. 141, n. 10, p. 04015029-1-4, 2015.1943-7862http://www.repositorio.ufc.br/handle/riufc/71983ark:/83112/001300002msfxPrata, Bruno de AthaydePitombeira Neto, Anselmo RamalhoSales, Caio Jucá de Moraesinfo:eu-repo/semantics/openAccessengreponame:Repositório Institucional da Universidade Federal do Ceará (UFC)instname:Universidade Federal do Ceará (UFC)instacron:UFC2023-12-07T17:04:15Zoai:repositorio.ufc.br:riufc/71983Repositório InstitucionalPUBhttp://www.repositorio.ufc.br/ri-oai/requestbu@ufc.br || repositorio@ufc.bropendoar:2023-12-07T17:04:15Repositório Institucional da Universidade Federal do Ceará (UFC) - Universidade Federal do Ceará (UFC)false |
dc.title.none.fl_str_mv |
An integer linear programming model for the multiperiod production planning of precast concrete beams |
title |
An integer linear programming model for the multiperiod production planning of precast concrete beams |
spellingShingle |
An integer linear programming model for the multiperiod production planning of precast concrete beams Prata, Bruno de Athayde Precast concrete beams Production planning Integer linear programming Quantitative methods |
title_short |
An integer linear programming model for the multiperiod production planning of precast concrete beams |
title_full |
An integer linear programming model for the multiperiod production planning of precast concrete beams |
title_fullStr |
An integer linear programming model for the multiperiod production planning of precast concrete beams |
title_full_unstemmed |
An integer linear programming model for the multiperiod production planning of precast concrete beams |
title_sort |
An integer linear programming model for the multiperiod production planning of precast concrete beams |
author |
Prata, Bruno de Athayde |
author_facet |
Prata, Bruno de Athayde Pitombeira Neto, Anselmo Ramalho Sales, Caio Jucá de Moraes |
author_role |
author |
author2 |
Pitombeira Neto, Anselmo Ramalho Sales, Caio Jucá de Moraes |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Prata, Bruno de Athayde Pitombeira Neto, Anselmo Ramalho Sales, Caio Jucá de Moraes |
dc.subject.por.fl_str_mv |
Precast concrete beams Production planning Integer linear programming Quantitative methods |
topic |
Precast concrete beams Production planning Integer linear programming Quantitative methods |
description |
Unlike conventional beams, which are cast in the construction site, precast beams are cast in a production line in a beam factory.Their use may considerably reduce the completion time of construction projects, making them attractive to public housing. A key factor forthe success of their use is the ability of efficiently producing them, which depends on the quality of the production planning. The objective ofthis paper is to propose an integer linear programming model for the precast concrete beams production problem. It is first shown that thisproblem is isomorphic to the well-known multiperiod cutting stock problem. The objective function is the minimization of the production lossof a production order, subject to the available capacity of forms used to cast the beams. A case study is presented with data of a real scaleinstance, so as to demonstrate the applicability of the model in industrial settings. The proposed model was implemented and ran on theCPLEX solver, which reached an optimal solution within an acceptable running time. The results indicate that significant gains may beachieved in terms of reduction of planning time through the application of the proposed model. |
publishDate |
2015 |
dc.date.none.fl_str_mv |
2015 2023-05-02T15:43:35Z 2023-05-02T15:43:35Z |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
PRATA, Bruno de Athayde; PITOMBEIRA NETO, Anselmo Ramalho; SALES, Caio Jucá de Moraes. An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, [S. l.], v. 141, n. 10, p. 04015029-1-4, 2015. 1943-7862 http://www.repositorio.ufc.br/handle/riufc/71983 |
dc.identifier.dark.fl_str_mv |
ark:/83112/001300002msfx |
identifier_str_mv |
PRATA, Bruno de Athayde; PITOMBEIRA NETO, Anselmo Ramalho; SALES, Caio Jucá de Moraes. An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, [S. l.], v. 141, n. 10, p. 04015029-1-4, 2015. 1943-7862 ark:/83112/001300002msfx |
url |
http://www.repositorio.ufc.br/handle/riufc/71983 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.format.none.fl_str_mv |
application/pdf |
dc.publisher.none.fl_str_mv |
Journal of Construction Engineering and Management |
publisher.none.fl_str_mv |
Journal of Construction Engineering and Management |
dc.source.none.fl_str_mv |
reponame:Repositório Institucional da Universidade Federal do Ceará (UFC) instname:Universidade Federal do Ceará (UFC) instacron:UFC |
instname_str |
Universidade Federal do Ceará (UFC) |
instacron_str |
UFC |
institution |
UFC |
reponame_str |
Repositório Institucional da Universidade Federal do Ceará (UFC) |
collection |
Repositório Institucional da Universidade Federal do Ceará (UFC) |
repository.name.fl_str_mv |
Repositório Institucional da Universidade Federal do Ceará (UFC) - Universidade Federal do Ceará (UFC) |
repository.mail.fl_str_mv |
bu@ufc.br || repositorio@ufc.br |
_version_ |
1834207761035952128 |