A method for project portfolio risk assessment considering risk interdependencies – a network perspective
Autor(a) principal: | |
---|---|
Data de Publicação: | 2022 |
Outros Autores: | , |
Tipo de documento: | Artigo |
Idioma: | eng |
Título da fonte: | Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) |
Texto Completo: | https://hdl.handle.net/10316/100868 https://doi.org/10.1016/j.procs.2021.12.096 |
Resumo: | Project portfolios represent the bridge between projects and strategy. However, the final results may not be as expected because materialization of risk factors. Hence, literature has acknowledged project portfolio risk assessment as an element of the project portfolio risk management, being the element that provides information on the importance of risk factors. For that, some specific characteristics should be considered, such as risk interdependency influence and the risk factors impact over portfolio higher levels. Thus, this study is focused on the development of a method for project portfolio risk assessment that considers both risk factor interdependencies and their impact on the strategic objectives as a network. In addition, the method also allows incorporating both risk factors derived from projects and derived at project portfolio level. A representative example is provided to illustrate the proposed method. |
id |
RCAP_8ffbeeb272ae9ded7851e9973345d8ce |
---|---|
oai_identifier_str |
oai:estudogeral.uc.pt:10316/100868 |
network_acronym_str |
RCAP |
network_name_str |
Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) |
repository_id_str |
https://opendoar.ac.uk/repository/7160 |
spelling |
A method for project portfolio risk assessment considering risk interdependencies – a network perspectiveProject portfoliorisk assessmentrisk factorsnetwork theoryProject portfolios represent the bridge between projects and strategy. However, the final results may not be as expected because materialization of risk factors. Hence, literature has acknowledged project portfolio risk assessment as an element of the project portfolio risk management, being the element that provides information on the importance of risk factors. For that, some specific characteristics should be considered, such as risk interdependency influence and the risk factors impact over portfolio higher levels. Thus, this study is focused on the development of a method for project portfolio risk assessment that considers both risk factor interdependencies and their impact on the strategic objectives as a network. In addition, the method also allows incorporating both risk factors derived from projects and derived at project portfolio level. A representative example is provided to illustrate the proposed method.2022info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/articlehttps://hdl.handle.net/10316/100868https://hdl.handle.net/10316/100868https://doi.org/10.1016/j.procs.2021.12.096eng18770509Mican, CamiloFernandes, GabrielaAraújo, Madalenainfo:eu-repo/semantics/openAccessreponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiainstacron:RCAAP2024-12-03T14:15:17Zoai:estudogeral.uc.pt:10316/100868Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireinfo@rcaap.ptopendoar:https://opendoar.ac.uk/repository/71602025-05-29T05:50:03.272377Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiafalse |
dc.title.none.fl_str_mv |
A method for project portfolio risk assessment considering risk interdependencies – a network perspective |
title |
A method for project portfolio risk assessment considering risk interdependencies – a network perspective |
spellingShingle |
A method for project portfolio risk assessment considering risk interdependencies – a network perspective Mican, Camilo Project portfolio risk assessment risk factors network theory |
title_short |
A method for project portfolio risk assessment considering risk interdependencies – a network perspective |
title_full |
A method for project portfolio risk assessment considering risk interdependencies – a network perspective |
title_fullStr |
A method for project portfolio risk assessment considering risk interdependencies – a network perspective |
title_full_unstemmed |
A method for project portfolio risk assessment considering risk interdependencies – a network perspective |
title_sort |
A method for project portfolio risk assessment considering risk interdependencies – a network perspective |
author |
Mican, Camilo |
author_facet |
Mican, Camilo Fernandes, Gabriela Araújo, Madalena |
author_role |
author |
author2 |
Fernandes, Gabriela Araújo, Madalena |
author2_role |
author author |
dc.contributor.author.fl_str_mv |
Mican, Camilo Fernandes, Gabriela Araújo, Madalena |
dc.subject.por.fl_str_mv |
Project portfolio risk assessment risk factors network theory |
topic |
Project portfolio risk assessment risk factors network theory |
description |
Project portfolios represent the bridge between projects and strategy. However, the final results may not be as expected because materialization of risk factors. Hence, literature has acknowledged project portfolio risk assessment as an element of the project portfolio risk management, being the element that provides information on the importance of risk factors. For that, some specific characteristics should be considered, such as risk interdependency influence and the risk factors impact over portfolio higher levels. Thus, this study is focused on the development of a method for project portfolio risk assessment that considers both risk factor interdependencies and their impact on the strategic objectives as a network. In addition, the method also allows incorporating both risk factors derived from projects and derived at project portfolio level. A representative example is provided to illustrate the proposed method. |
publishDate |
2022 |
dc.date.none.fl_str_mv |
2022 |
dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
dc.type.driver.fl_str_mv |
info:eu-repo/semantics/article |
format |
article |
status_str |
publishedVersion |
dc.identifier.uri.fl_str_mv |
https://hdl.handle.net/10316/100868 https://hdl.handle.net/10316/100868 https://doi.org/10.1016/j.procs.2021.12.096 |
url |
https://hdl.handle.net/10316/100868 https://doi.org/10.1016/j.procs.2021.12.096 |
dc.language.iso.fl_str_mv |
eng |
language |
eng |
dc.relation.none.fl_str_mv |
18770509 |
dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
eu_rights_str_mv |
openAccess |
dc.source.none.fl_str_mv |
reponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia instacron:RCAAP |
instname_str |
FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia |
instacron_str |
RCAAP |
institution |
RCAAP |
reponame_str |
Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) |
collection |
Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) |
repository.name.fl_str_mv |
Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia |
repository.mail.fl_str_mv |
info@rcaap.pt |
_version_ |
1833602489140641792 |