Flexible job shop scheduling problem in manufacturing
| Autor(a) principal: | |
|---|---|
| Data de Publicação: | 2013 |
| Outros Autores: | , , |
| Idioma: | eng |
| Título da fonte: | Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) |
| Texto Completo: | http://hdl.handle.net/10198/11054 |
Resumo: | This paper addresses a real assembly cell: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France. This system can be viewed as a Flexible Job Shop, leading to the formulation of a Flexible Job Shop Scheduling Problem (FJSSP). |
| id |
RCAP_3abff734d26fd883290ac1a77f49f918 |
|---|---|
| oai_identifier_str |
oai:bibliotecadigital.ipb.pt:10198/11054 |
| network_acronym_str |
RCAP |
| network_name_str |
Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) |
| repository_id_str |
https://opendoar.ac.uk/repository/7160 |
| spelling |
Flexible job shop scheduling problem in manufacturingFlexible job shop problemGenetic algorithmThis paper addresses a real assembly cell: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France. This system can be viewed as a Flexible Job Shop, leading to the formulation of a Flexible Job Shop Scheduling Problem (FJSSP).Biblioteca Digital do IPBCurralo, AnaPereira, Ana I.Barbosa, JoséLeitão, Paulo2014-10-27T12:17:48Z20132013-01-01T00:00:00Zconference objectinfo:eu-repo/semantics/publishedVersionapplication/pdfhttp://hdl.handle.net/10198/11054engCurralo, Ana; Pereira, Ana I.; Barbosa, José; Leitão, Paulo (2013). Flexible job shop scheduling problem in manufacturing. In Mathematical Methods in Engineering International Conference. Instituto Superior de Engenharia do Portoinfo:eu-repo/semantics/openAccessreponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiainstacron:RCAAP2025-02-25T12:02:07Zoai:bibliotecadigital.ipb.pt:10198/11054Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireinfo@rcaap.ptopendoar:https://opendoar.ac.uk/repository/71602025-05-28T11:27:14.007291Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiafalse |
| dc.title.none.fl_str_mv |
Flexible job shop scheduling problem in manufacturing |
| title |
Flexible job shop scheduling problem in manufacturing |
| spellingShingle |
Flexible job shop scheduling problem in manufacturing Curralo, Ana Flexible job shop problem Genetic algorithm |
| title_short |
Flexible job shop scheduling problem in manufacturing |
| title_full |
Flexible job shop scheduling problem in manufacturing |
| title_fullStr |
Flexible job shop scheduling problem in manufacturing |
| title_full_unstemmed |
Flexible job shop scheduling problem in manufacturing |
| title_sort |
Flexible job shop scheduling problem in manufacturing |
| author |
Curralo, Ana |
| author_facet |
Curralo, Ana Pereira, Ana I. Barbosa, José Leitão, Paulo |
| author_role |
author |
| author2 |
Pereira, Ana I. Barbosa, José Leitão, Paulo |
| author2_role |
author author author |
| dc.contributor.none.fl_str_mv |
Biblioteca Digital do IPB |
| dc.contributor.author.fl_str_mv |
Curralo, Ana Pereira, Ana I. Barbosa, José Leitão, Paulo |
| dc.subject.por.fl_str_mv |
Flexible job shop problem Genetic algorithm |
| topic |
Flexible job shop problem Genetic algorithm |
| description |
This paper addresses a real assembly cell: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France. This system can be viewed as a Flexible Job Shop, leading to the formulation of a Flexible Job Shop Scheduling Problem (FJSSP). |
| publishDate |
2013 |
| dc.date.none.fl_str_mv |
2013 2013-01-01T00:00:00Z 2014-10-27T12:17:48Z |
| dc.type.driver.fl_str_mv |
conference object |
| dc.type.status.fl_str_mv |
info:eu-repo/semantics/publishedVersion |
| status_str |
publishedVersion |
| dc.identifier.uri.fl_str_mv |
http://hdl.handle.net/10198/11054 |
| url |
http://hdl.handle.net/10198/11054 |
| dc.language.iso.fl_str_mv |
eng |
| language |
eng |
| dc.relation.none.fl_str_mv |
Curralo, Ana; Pereira, Ana I.; Barbosa, José; Leitão, Paulo (2013). Flexible job shop scheduling problem in manufacturing. In Mathematical Methods in Engineering International Conference. Instituto Superior de Engenharia do Porto |
| dc.rights.driver.fl_str_mv |
info:eu-repo/semantics/openAccess |
| eu_rights_str_mv |
openAccess |
| dc.format.none.fl_str_mv |
application/pdf |
| dc.source.none.fl_str_mv |
reponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia instacron:RCAAP |
| instname_str |
FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia |
| instacron_str |
RCAAP |
| institution |
RCAAP |
| reponame_str |
Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) |
| collection |
Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) |
| repository.name.fl_str_mv |
Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia |
| repository.mail.fl_str_mv |
info@rcaap.pt |
| _version_ |
1833591920193961984 |