Projecto e Construção de Linha Aérea Alta Tensão

Bibliographic Details
Main Author: Alice Araújo da Silva
Publication Date: 2019
Format: Master thesis
Language: por
Source: Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
Download full: https://hdl.handle.net/10216/119027
Summary: The execution of the dissertation project "Project and Construction of High Voltage Overhead Line" took place during the graduate traineeship at EDP - Distribuição SA, in the Department of Services for Networks, in the Department of Investment Management.The proposal is based on the elaboration of a project of a high voltage line of 60 KV, which connects the substation of Nogueira da Regedoura, in Santa Maria da Feira, District of Aveiro, Espinho, in the same district. It is a double line consisting of six ACSR 325 conductor cables and a guard cable OPGW AA/ACS/ST 157/60 24 FO, about 3.2 km long and has a transport capacity of 120 MW.The project was drafted according the guidelines of Portugal's High Voltage Power Line Safety Regulation, complying with all the provisions on the location of the supports, minimum distances required, for their structures and their surroundings, as well as, for the conductors of the line.The experience and sensitivity of the designer are determining factors when carrying out a project. The maximum traction of the conductor or guard cable is one of these characteristics. The determination of the maximum voltage to be used was calculated not only by Portugal's High Voltage Power Line Safety Regulation and the maximum safety traction of the condutctor, but also considered the traction, on average, to which the conductor will be subjected daily (EDS), trying not to exceed the fatigue of the conductor under dynamic regime.It was the object of work to automate the systematic calculation of the stability check of the supports, being only necessary the characterization of the span and its angle, the maximum traction and the type of support. The dissertation work was performed with the Microsoft Office Excel software.
id RCAP_2536faea8137675f0a48aad9d8ecb8ff
oai_identifier_str oai:repositorio-aberto.up.pt:10216/119027
network_acronym_str RCAP
network_name_str Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
repository_id_str https://opendoar.ac.uk/repository/7160
spelling Projecto e Construção de Linha Aérea Alta TensãoEngenharia electrotécnica, electrónica e informáticaElectrical engineering, Electronic engineering, Information engineeringThe execution of the dissertation project "Project and Construction of High Voltage Overhead Line" took place during the graduate traineeship at EDP - Distribuição SA, in the Department of Services for Networks, in the Department of Investment Management.The proposal is based on the elaboration of a project of a high voltage line of 60 KV, which connects the substation of Nogueira da Regedoura, in Santa Maria da Feira, District of Aveiro, Espinho, in the same district. It is a double line consisting of six ACSR 325 conductor cables and a guard cable OPGW AA/ACS/ST 157/60 24 FO, about 3.2 km long and has a transport capacity of 120 MW.The project was drafted according the guidelines of Portugal's High Voltage Power Line Safety Regulation, complying with all the provisions on the location of the supports, minimum distances required, for their structures and their surroundings, as well as, for the conductors of the line.The experience and sensitivity of the designer are determining factors when carrying out a project. The maximum traction of the conductor or guard cable is one of these characteristics. The determination of the maximum voltage to be used was calculated not only by Portugal's High Voltage Power Line Safety Regulation and the maximum safety traction of the condutctor, but also considered the traction, on average, to which the conductor will be subjected daily (EDS), trying not to exceed the fatigue of the conductor under dynamic regime.It was the object of work to automate the systematic calculation of the stability check of the supports, being only necessary the characterization of the span and its angle, the maximum traction and the type of support. The dissertation work was performed with the Microsoft Office Excel software.2019-02-062019-02-06T00:00:00Zinfo:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesisapplication/pdfhttps://hdl.handle.net/10216/119027TID:202388743porAlice Araújo da Silvainfo:eu-repo/semantics/openAccessreponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiainstacron:RCAAP2025-02-27T19:17:49Zoai:repositorio-aberto.up.pt:10216/119027Portal AgregadorONGhttps://www.rcaap.pt/oai/openaireinfo@rcaap.ptopendoar:https://opendoar.ac.uk/repository/71602025-05-28T23:13:49.248141Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologiafalse
dc.title.none.fl_str_mv Projecto e Construção de Linha Aérea Alta Tensão
title Projecto e Construção de Linha Aérea Alta Tensão
spellingShingle Projecto e Construção de Linha Aérea Alta Tensão
Alice Araújo da Silva
Engenharia electrotécnica, electrónica e informática
Electrical engineering, Electronic engineering, Information engineering
title_short Projecto e Construção de Linha Aérea Alta Tensão
title_full Projecto e Construção de Linha Aérea Alta Tensão
title_fullStr Projecto e Construção de Linha Aérea Alta Tensão
title_full_unstemmed Projecto e Construção de Linha Aérea Alta Tensão
title_sort Projecto e Construção de Linha Aérea Alta Tensão
author Alice Araújo da Silva
author_facet Alice Araújo da Silva
author_role author
dc.contributor.author.fl_str_mv Alice Araújo da Silva
dc.subject.por.fl_str_mv Engenharia electrotécnica, electrónica e informática
Electrical engineering, Electronic engineering, Information engineering
topic Engenharia electrotécnica, electrónica e informática
Electrical engineering, Electronic engineering, Information engineering
description The execution of the dissertation project "Project and Construction of High Voltage Overhead Line" took place during the graduate traineeship at EDP - Distribuição SA, in the Department of Services for Networks, in the Department of Investment Management.The proposal is based on the elaboration of a project of a high voltage line of 60 KV, which connects the substation of Nogueira da Regedoura, in Santa Maria da Feira, District of Aveiro, Espinho, in the same district. It is a double line consisting of six ACSR 325 conductor cables and a guard cable OPGW AA/ACS/ST 157/60 24 FO, about 3.2 km long and has a transport capacity of 120 MW.The project was drafted according the guidelines of Portugal's High Voltage Power Line Safety Regulation, complying with all the provisions on the location of the supports, minimum distances required, for their structures and their surroundings, as well as, for the conductors of the line.The experience and sensitivity of the designer are determining factors when carrying out a project. The maximum traction of the conductor or guard cable is one of these characteristics. The determination of the maximum voltage to be used was calculated not only by Portugal's High Voltage Power Line Safety Regulation and the maximum safety traction of the condutctor, but also considered the traction, on average, to which the conductor will be subjected daily (EDS), trying not to exceed the fatigue of the conductor under dynamic regime.It was the object of work to automate the systematic calculation of the stability check of the supports, being only necessary the characterization of the span and its angle, the maximum traction and the type of support. The dissertation work was performed with the Microsoft Office Excel software.
publishDate 2019
dc.date.none.fl_str_mv 2019-02-06
2019-02-06T00:00:00Z
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/masterThesis
format masterThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://hdl.handle.net/10216/119027
TID:202388743
url https://hdl.handle.net/10216/119027
identifier_str_mv TID:202388743
dc.language.iso.fl_str_mv por
language por
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.source.none.fl_str_mv reponame:Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
instname:FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia
instacron:RCAAP
instname_str FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia
instacron_str RCAAP
institution RCAAP
reponame_str Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
collection Repositórios Científicos de Acesso Aberto de Portugal (RCAAP)
repository.name.fl_str_mv Repositórios Científicos de Acesso Aberto de Portugal (RCAAP) - FCCN, serviços digitais da FCT – Fundação para a Ciência e a Tecnologia
repository.mail.fl_str_mv info@rcaap.pt
_version_ 1833600065763016705