[en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING

Detalhes bibliográficos
Autor(a) principal: ARTHUR DE CASTRO BRIGATTO
Data de Publicação: 2016
Tipo de documento: Tese
Idioma: eng
Título da fonte: Repositório Institucional da PUC-RIO (Projeto Maxwell)
Texto Completo: https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=27876&idi=1
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=27876&idi=2
http://doi.org/10.17771/PUCRio.acad.27876
Resumo: [pt] Atualmente a metodologia correspondente ao estado da arte utilizada para o planejamento de médio-/longo-prazo da operação de sistemas elétricos de potência é a Programação Dual Dinâmica Estocástica (PDDE). No entanto, a tratabilidade computacional proporcionada por este método ainda requer simplificaçõeses consideráveis de detalhes de sistemas reais de maneira a atingir performaces aceitáveis em aplicações práticas. Simplificações feitas no estágio de planejamento em contraste com a implementação das decisões podem induzir políticas temporalmente inconsistentes e, consequentemente, um gap de sub-otimalidade. Inconsisência temporal em planejamento hidrotérmico pode ser induzida, por exemplo, ao assumir um coeficiente de produtividade constante para as hidrelétricas, ao agregar os reservatórios, ao negligenciar a segunda lei de Kirchhoff e neglienciando-se critérios de segurança em modelos de planejamento. As mesmas restrições são posteriormente consideradas na etapa de implementação do sistema. Esse fato pode estar envolvido com esvaziamento não planejado de reservatórios e entregabilidade inadequada de reservas girantes. Ambos podem levar a altos custos operacionais. Além disso, o sistema pode ficar exposto a um risco sistêmico de racionamento e em última instâcia, blackouts. O gap de sub-otimalidade pode também levar a distorções em mercados de energia. Assim, é razoável que as consequências da inconstência temporal em sistemas hidrotérmicos sejam estudadas. Nesse sentido, este trabalho propõe uma extensão de trabalhos já realizados relacionados à inconsistência temporal para medir os efeitos de simplificações de modelagem em modelos de planejamento resolvidos pela PDDE. A abordagem proposta consiste em usar um modelo simplificado para o planejamento do sistema, que é feito pela avaliação da função de recurso, e um modelo detalhado para a sua operação. Estudos de caso envolvendo simplificações em modelagem de linhas de transmissão e critérios de segurança são realizados. No entanto, o foco deste trabalho se dará na segunda fonte, já que a mesma apresenta maior complexidade na caracterização do efeito. No entanto, a incorporação de critérios de segurança é um grande desafio para operadores de sistemas elétricos, pois o tamanho do modelo tende a crescer exponencialmente quando critérios de segurança reforçados são aplicados. Motivado por isso, o principal objetivo deste trabalho é propor uma nova abordagem ao problema que permite que critérios de segurança possam ser incorporados em modelos de planejamento e consequentemente garantir a entregabilidade de reservas em políticas de planejamento. A formulação do problema é uma extensão multiperiodo e estocástica the modelos de Otimização Robusta Ajustável que já foram propostos na literatura para resolver o problema relacionado à dimensionalidade para um período. A metodologia de solução involve um algoritmo híbrido Robusto-PDDE que por meio do compartilhamento de estados de contingência ativos entre os períodos e cenários de afluência é capaz de atingir tratabilidade computacional. Com a nova abordagem proposta, é possível (i) resolver o problema de agendamento ótimo das reservas em sistemas hidrotérmicos garantindo a entregabilidade das reservas em um critério n - K e (ii) calcular o custo e os efeitos negativos de se negligenciar critérios de segurança no planejamento.
id PUC_RIO-1_a7366d358f183fb32ba00a24a5127c33
oai_identifier_str oai:MAXWELL.puc-rio.br:27876
network_acronym_str PUC_RIO-1
network_name_str Repositório Institucional da PUC-RIO (Projeto Maxwell)
repository_id_str 534
spelling [en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING [pt] GARANTINDO A ENTREGABILIDADE DE RESERVAS NO PLANEJAMENTO DE SISTEMAS DE POTÊNCIA HIDROTÉRMICOS [pt] OTIMIZACAO ESTOCASTICA[pt] INCONSISTENCIA TEMPORAL[pt] PLANEJAMENTO DA OPERACAO DE SISTEMAS DE POTENCIA HIDROTERMICOS[pt] ALGORITMO DE GERACAO DE COLUNA E RESTRICAO[pt] PROGRAMACAO DUAL DINAMICA ESTOCASTICA[pt] OTIMIZACAO ROBUSTA[en] STOCHASTIC OPTIMIZATION[en] TIME INCONSISTENCY[en] HYDROTHERMAL POWER SYSTEMS OPERATION PLANNING[en] COLUMN-AND-CONSTRAINT-GENERATION ALGORITHM[en] STOCHASTIC DUAL DYNAMIC PROGRAMMING REAL OPTIONS[en] ROBUST OPTIMIZATION[pt] Atualmente a metodologia correspondente ao estado da arte utilizada para o planejamento de médio-/longo-prazo da operação de sistemas elétricos de potência é a Programação Dual Dinâmica Estocástica (PDDE). No entanto, a tratabilidade computacional proporcionada por este método ainda requer simplificaçõeses consideráveis de detalhes de sistemas reais de maneira a atingir performaces aceitáveis em aplicações práticas. Simplificações feitas no estágio de planejamento em contraste com a implementação das decisões podem induzir políticas temporalmente inconsistentes e, consequentemente, um gap de sub-otimalidade. Inconsisência temporal em planejamento hidrotérmico pode ser induzida, por exemplo, ao assumir um coeficiente de produtividade constante para as hidrelétricas, ao agregar os reservatórios, ao negligenciar a segunda lei de Kirchhoff e neglienciando-se critérios de segurança em modelos de planejamento. As mesmas restrições são posteriormente consideradas na etapa de implementação do sistema. Esse fato pode estar envolvido com esvaziamento não planejado de reservatórios e entregabilidade inadequada de reservas girantes. Ambos podem levar a altos custos operacionais. Além disso, o sistema pode ficar exposto a um risco sistêmico de racionamento e em última instâcia, blackouts. O gap de sub-otimalidade pode também levar a distorções em mercados de energia. Assim, é razoável que as consequências da inconstência temporal em sistemas hidrotérmicos sejam estudadas. Nesse sentido, este trabalho propõe uma extensão de trabalhos já realizados relacionados à inconsistência temporal para medir os efeitos de simplificações de modelagem em modelos de planejamento resolvidos pela PDDE. A abordagem proposta consiste em usar um modelo simplificado para o planejamento do sistema, que é feito pela avaliação da função de recurso, e um modelo detalhado para a sua operação. Estudos de caso envolvendo simplificações em modelagem de linhas de transmissão e critérios de segurança são realizados. No entanto, o foco deste trabalho se dará na segunda fonte, já que a mesma apresenta maior complexidade na caracterização do efeito. No entanto, a incorporação de critérios de segurança é um grande desafio para operadores de sistemas elétricos, pois o tamanho do modelo tende a crescer exponencialmente quando critérios de segurança reforçados são aplicados. Motivado por isso, o principal objetivo deste trabalho é propor uma nova abordagem ao problema que permite que critérios de segurança possam ser incorporados em modelos de planejamento e consequentemente garantir a entregabilidade de reservas em políticas de planejamento. A formulação do problema é uma extensão multiperiodo e estocástica the modelos de Otimização Robusta Ajustável que já foram propostos na literatura para resolver o problema relacionado à dimensionalidade para um período. A metodologia de solução involve um algoritmo híbrido Robusto-PDDE que por meio do compartilhamento de estados de contingência ativos entre os períodos e cenários de afluência é capaz de atingir tratabilidade computacional. Com a nova abordagem proposta, é possível (i) resolver o problema de agendamento ótimo das reservas em sistemas hidrotérmicos garantindo a entregabilidade das reservas em um critério n - K e (ii) calcular o custo e os efeitos negativos de se negligenciar critérios de segurança no planejamento.[en] The current state of the art method used for medium/long-term planning studies of hydrothermal power system operation is the Stochastic Dual Dynamic Programming (SDDP) algorithm. The computational savings provided by this method notwithstanding, it still relies on major system simplifications to achieve acceptable performances in practical applications. Simplifications in the planning stage in contrast to the actual implementation might induce time inconsistent policies and, consequently, a sub-optimality gap. Time inconsistency in hydrothermal planning might be induced by, for instance, assuming a constant coefficient production for hydro plants, reservoir aggregation, neglecting Kirchhoff s voltage law, and neglecting security criteria in planning models, which are then incorporated in implementating models. Unaccounted for reservoir depletion and inadequate spinning reserve deliverability situations that were observed in the Brazilian power system might be induced by time inconsistency. And this can lead to higher operational costs. Both these consequences are utterly negative since they pose the system to a great systemic risk of energy rationing or ultimately, system blackouts. In addition, the suboptimility gap may also lead to energy markets distortions. Hence, it seems reasonable that further investigations on consequences of time inconsistency in hydrothermal planning should be undertaken. Along these lines, this work proposes an extension to previous work on the subject of time inconsistency to measure the effects of modeling simplifications in the SDDP framework for hydrothermal operation planning. The approach consists of using a simplified model for planning the system, which is done by means of the assessment of the recourse (cost-to-go) function, and a detailed model for its operation (implementation of the policy). Case studies involving simplifications in transmission lines modeling and in security criteria are carried out. Nevertheless, the focus of this work is on the later source as it is more difficult to address due to the complexity involved in the characterization of this effect. However, incorporating security criteria in planning models poses a major challenge to system operators. This is because the size of the model tends to grow exponentially as tighter security criteria are adopted. Motivated by this, the main objective of this work is to propose a new framework that allows security criteria to be incorporated in planning models and consequently ensure reserve deliverability in planning policies. The problem formulation is a multiperiod stochastic extension of Adjustable Robust Optimization (ARO) based models already proposed in literature to successfully address the dimensionality issue regarding the incorporation of security criteria n - K and its variants. The solution methodology involves a hybrid Robust-SDDP algorithm that by means of sharing active contingency states amongst periods and possible inflow scenarios in the SDDP algorithm is capable of achieving computational tractability. Then, with the proposed approach it is possible to (i) address the optimal scheduling of energy and reserve in hydrothermal power systems ensuring reserve deliverability under an n - K security criterion and (ii) assess the cost and side effects of disregarding security criteria in the planning stage.MAXWELLALEXANDRE STREET DE AGUIARALEXANDRE STREET DE AGUIARALEXANDRE STREET DE AGUIARARTHUR DE CASTRO BRIGATTO2016-11-03info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/doctoralThesishttps://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=27876&idi=1https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=27876&idi=2http://doi.org/10.17771/PUCRio.acad.27876engreponame:Repositório Institucional da PUC-RIO (Projeto Maxwell)instname:Pontifícia Universidade Católica do Rio de Janeiro (PUC-RIO)instacron:PUC_RIOinfo:eu-repo/semantics/openAccess2022-06-29T00:00:00Zoai:MAXWELL.puc-rio.br:27876Repositório InstitucionalPRIhttps://www.maxwell.vrac.puc-rio.br/ibict.phpopendoar:5342022-06-29T00:00Repositório Institucional da PUC-RIO (Projeto Maxwell) - Pontifícia Universidade Católica do Rio de Janeiro (PUC-RIO)false
dc.title.none.fl_str_mv [en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING
[pt] GARANTINDO A ENTREGABILIDADE DE RESERVAS NO PLANEJAMENTO DE SISTEMAS DE POTÊNCIA HIDROTÉRMICOS
title [en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING
spellingShingle [en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING
ARTHUR DE CASTRO BRIGATTO
[pt] OTIMIZACAO ESTOCASTICA
[pt] INCONSISTENCIA TEMPORAL
[pt] PLANEJAMENTO DA OPERACAO DE SISTEMAS DE POTENCIA HIDROTERMICOS
[pt] ALGORITMO DE GERACAO DE COLUNA E RESTRICAO
[pt] PROGRAMACAO DUAL DINAMICA ESTOCASTICA
[pt] OTIMIZACAO ROBUSTA
[en] STOCHASTIC OPTIMIZATION
[en] TIME INCONSISTENCY
[en] HYDROTHERMAL POWER SYSTEMS OPERATION PLANNING
[en] COLUMN-AND-CONSTRAINT-GENERATION ALGORITHM
[en] STOCHASTIC DUAL DYNAMIC PROGRAMMING REAL OPTIONS
[en] ROBUST OPTIMIZATION
title_short [en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING
title_full [en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING
title_fullStr [en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING
title_full_unstemmed [en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING
title_sort [en] ENSURING RESERVE DEPLOYMENT IN HYDROTHERMAL POWER SYSTEMS PLANNING
author ARTHUR DE CASTRO BRIGATTO
author_facet ARTHUR DE CASTRO BRIGATTO
author_role author
dc.contributor.none.fl_str_mv ALEXANDRE STREET DE AGUIAR
ALEXANDRE STREET DE AGUIAR
ALEXANDRE STREET DE AGUIAR
dc.contributor.author.fl_str_mv ARTHUR DE CASTRO BRIGATTO
dc.subject.por.fl_str_mv [pt] OTIMIZACAO ESTOCASTICA
[pt] INCONSISTENCIA TEMPORAL
[pt] PLANEJAMENTO DA OPERACAO DE SISTEMAS DE POTENCIA HIDROTERMICOS
[pt] ALGORITMO DE GERACAO DE COLUNA E RESTRICAO
[pt] PROGRAMACAO DUAL DINAMICA ESTOCASTICA
[pt] OTIMIZACAO ROBUSTA
[en] STOCHASTIC OPTIMIZATION
[en] TIME INCONSISTENCY
[en] HYDROTHERMAL POWER SYSTEMS OPERATION PLANNING
[en] COLUMN-AND-CONSTRAINT-GENERATION ALGORITHM
[en] STOCHASTIC DUAL DYNAMIC PROGRAMMING REAL OPTIONS
[en] ROBUST OPTIMIZATION
topic [pt] OTIMIZACAO ESTOCASTICA
[pt] INCONSISTENCIA TEMPORAL
[pt] PLANEJAMENTO DA OPERACAO DE SISTEMAS DE POTENCIA HIDROTERMICOS
[pt] ALGORITMO DE GERACAO DE COLUNA E RESTRICAO
[pt] PROGRAMACAO DUAL DINAMICA ESTOCASTICA
[pt] OTIMIZACAO ROBUSTA
[en] STOCHASTIC OPTIMIZATION
[en] TIME INCONSISTENCY
[en] HYDROTHERMAL POWER SYSTEMS OPERATION PLANNING
[en] COLUMN-AND-CONSTRAINT-GENERATION ALGORITHM
[en] STOCHASTIC DUAL DYNAMIC PROGRAMMING REAL OPTIONS
[en] ROBUST OPTIMIZATION
description [pt] Atualmente a metodologia correspondente ao estado da arte utilizada para o planejamento de médio-/longo-prazo da operação de sistemas elétricos de potência é a Programação Dual Dinâmica Estocástica (PDDE). No entanto, a tratabilidade computacional proporcionada por este método ainda requer simplificaçõeses consideráveis de detalhes de sistemas reais de maneira a atingir performaces aceitáveis em aplicações práticas. Simplificações feitas no estágio de planejamento em contraste com a implementação das decisões podem induzir políticas temporalmente inconsistentes e, consequentemente, um gap de sub-otimalidade. Inconsisência temporal em planejamento hidrotérmico pode ser induzida, por exemplo, ao assumir um coeficiente de produtividade constante para as hidrelétricas, ao agregar os reservatórios, ao negligenciar a segunda lei de Kirchhoff e neglienciando-se critérios de segurança em modelos de planejamento. As mesmas restrições são posteriormente consideradas na etapa de implementação do sistema. Esse fato pode estar envolvido com esvaziamento não planejado de reservatórios e entregabilidade inadequada de reservas girantes. Ambos podem levar a altos custos operacionais. Além disso, o sistema pode ficar exposto a um risco sistêmico de racionamento e em última instâcia, blackouts. O gap de sub-otimalidade pode também levar a distorções em mercados de energia. Assim, é razoável que as consequências da inconstência temporal em sistemas hidrotérmicos sejam estudadas. Nesse sentido, este trabalho propõe uma extensão de trabalhos já realizados relacionados à inconsistência temporal para medir os efeitos de simplificações de modelagem em modelos de planejamento resolvidos pela PDDE. A abordagem proposta consiste em usar um modelo simplificado para o planejamento do sistema, que é feito pela avaliação da função de recurso, e um modelo detalhado para a sua operação. Estudos de caso envolvendo simplificações em modelagem de linhas de transmissão e critérios de segurança são realizados. No entanto, o foco deste trabalho se dará na segunda fonte, já que a mesma apresenta maior complexidade na caracterização do efeito. No entanto, a incorporação de critérios de segurança é um grande desafio para operadores de sistemas elétricos, pois o tamanho do modelo tende a crescer exponencialmente quando critérios de segurança reforçados são aplicados. Motivado por isso, o principal objetivo deste trabalho é propor uma nova abordagem ao problema que permite que critérios de segurança possam ser incorporados em modelos de planejamento e consequentemente garantir a entregabilidade de reservas em políticas de planejamento. A formulação do problema é uma extensão multiperiodo e estocástica the modelos de Otimização Robusta Ajustável que já foram propostos na literatura para resolver o problema relacionado à dimensionalidade para um período. A metodologia de solução involve um algoritmo híbrido Robusto-PDDE que por meio do compartilhamento de estados de contingência ativos entre os períodos e cenários de afluência é capaz de atingir tratabilidade computacional. Com a nova abordagem proposta, é possível (i) resolver o problema de agendamento ótimo das reservas em sistemas hidrotérmicos garantindo a entregabilidade das reservas em um critério n - K e (ii) calcular o custo e os efeitos negativos de se negligenciar critérios de segurança no planejamento.
publishDate 2016
dc.date.none.fl_str_mv 2016-11-03
dc.type.status.fl_str_mv info:eu-repo/semantics/publishedVersion
dc.type.driver.fl_str_mv info:eu-repo/semantics/doctoralThesis
format doctoralThesis
status_str publishedVersion
dc.identifier.uri.fl_str_mv https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=27876&idi=1
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=27876&idi=2
http://doi.org/10.17771/PUCRio.acad.27876
url https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=27876&idi=1
https://www.maxwell.vrac.puc-rio.br/colecao.php?strSecao=resultado&nrSeq=27876&idi=2
http://doi.org/10.17771/PUCRio.acad.27876
dc.language.iso.fl_str_mv eng
language eng
dc.rights.driver.fl_str_mv info:eu-repo/semantics/openAccess
eu_rights_str_mv openAccess
dc.publisher.none.fl_str_mv MAXWELL
publisher.none.fl_str_mv MAXWELL
dc.source.none.fl_str_mv reponame:Repositório Institucional da PUC-RIO (Projeto Maxwell)
instname:Pontifícia Universidade Católica do Rio de Janeiro (PUC-RIO)
instacron:PUC_RIO
instname_str Pontifícia Universidade Católica do Rio de Janeiro (PUC-RIO)
instacron_str PUC_RIO
institution PUC_RIO
reponame_str Repositório Institucional da PUC-RIO (Projeto Maxwell)
collection Repositório Institucional da PUC-RIO (Projeto Maxwell)
repository.name.fl_str_mv Repositório Institucional da PUC-RIO (Projeto Maxwell) - Pontifícia Universidade Católica do Rio de Janeiro (PUC-RIO)
repository.mail.fl_str_mv
_version_ 1849967270766313472