Uma contribuição para determinação de valores de referência para as variações de tensão de curta duração

Detalhes bibliográficos
Ano de defesa: 2015
Autor(a) principal: Carneiro, Jules Renato Viana
Orientador(a): Não Informado pela instituição
Banca de defesa: Não Informado pela instituição
Tipo de documento: Dissertação
Tipo de acesso: Acesso aberto
Idioma: por
Instituição de defesa: Universidade Federal do Espírito Santo
BR
Mestrado em Engenharia Elétrica
Centro Tecnológico
UFES
Programa de Pós-Graduação em Engenharia Elétrica
Programa de Pós-Graduação: Não Informado pela instituição
Departamento: Não Informado pela instituição
País: Não Informado pela instituição
Palavras-chave em Português:
Link de acesso: http://repositorio.ufes.br/handle/10/9646
Resumo: This paper introduces the concepts, characteristics, causes, analysis methods and ways to quantify the short-duration voltage variations in electrical systems, dealing particularly ANEEL's proposal to create an indicator for the phenomenon to be used the electricity distribution sector in Brazil. Only an international standard has limits for voltage sags. Thus, the proposal to establish a methodology for quantifying the events with a specific indicator (Impact Factor) and the adoption of an associated limit represent a major signaling progress toward the establishment of consistent standards to be followed by utilities Brazilian forward to this important power quality phenomenon. To facilitate the assessment of the indicator, measuring equipment were installed in several buses 15 kV two Brazilian utilities, by collecting the records of short-duration voltage variations over an period of twelve consecutive months, for which was applied the method of quantification of events and obtaining indicators as ANEEL proposition. Further to, comparisons were made between the values obtained for the subsystems of the two utilities and the established limit, making possible inferences about the results and the possibility of attendance of utilities to the proposal adheres to the reality of them. Once the proposal is in force this question will be of great importance to all electricity distribution sector.