Aspectos executivos e a qualidade de estruturas em concreto armado : estudo de caso

Detalhes bibliográficos
Ano de defesa: 2009
Autor(a) principal: Takata, Leandro Teixeira
Orientador(a): Figueiredo Filho, Jasson Rodrigues de lattes
Banca de defesa: Não Informado pela instituição
Tipo de documento: Dissertação
Tipo de acesso: Acesso aberto
Idioma: por
Instituição de defesa: Universidade Federal de São Carlos
Programa de Pós-Graduação: Programa de Pós-Graduação em Engenharia Civil - PPGECiv
Departamento: Não Informado pela instituição
País: BR
Palavras-chave em Português:
Palavras-chave em Inglês:
Área do conhecimento CNPq:
Link de acesso: https://repositorio.ufscar.br/handle/ufscar/4655
Resumo: The execution of reinforced concrete structures is a construction stage that has significant importance in the overall context of a work and involves materials, suppliers, work fronts in the workplace and a large number of professionals. In this stage many problems may occur: inadequate use of materials, misinterpretation of the project, incorrect use of equipments, action of weather and other inconveniences. Carelessness at this stage can lead to major schedule delays and extra costs, as this will require new tasks, materials and equipment not predicted (a new set of forms can be used, but the material and labor for the service may not be available). Surveillance and attention are needed for a good final product which, however, is not always achieved. That is where the pathology of structures acts, aiming to correct and prevent failures in all constructive stages. Otherwise, problems may appear in the global chain of the work, leading to the need to restructure the process of execution of the building. Therefore, several authors propose standard, and even alternative, construction methods, companies provide manuals of performance and quality control of materials and the codes propose minimum requirements for safety, durability and quality of buildings. To study and improve the execution phase means, therefore, avoiding delays and additional costs, as well as ensuring that the building will have quality and durability. This paper analyzes the execution phase of a given multiple floor building, pointing out mistakes and their possible influences on the quality of the building during its service life.