Utilização de práticas e metodologias adaptativas de gerenciamento de projetos para o desenvolvimento de um programa de doutorado profissional

Detalhes bibliográficos
Ano de defesa: 2020
Autor(a) principal: Azevedo, Gabriel Barroso de lattes
Orientador(a): Maccari, Emerson Antonio
Banca de defesa: Maccari, Emerson Antonio, Mazieri, Marcos Rogério, Scafuto, Isabel Cristina, Almeida, Martinho Isnard Ribeiro de
Tipo de documento: Dissertação
Tipo de acesso: Acesso aberto
Idioma: por
Instituição de defesa: Universidade Nove de Julho
Programa de Pós-Graduação: Programa de Pós-Graduação em Gestão de Projetos
Departamento: Administração
País: Brasil
Palavras-chave em Português:
Palavras-chave em Inglês:
Área do conhecimento CNPq:
Link de acesso: http://bibliotecatede.uninove.br/handle/tede/2188
Resumo: Higher education institutions have used more and more project management tools to run development projects to create new professional postgraduate programs. The purpose of this research was to propose an adaptive project management model for the development of a professional doctoral course project in Business Administration, in order to fulfill the goals established by CAPES. For such, the qualitative approach was favored with the adoption of the single case study method. Semi-structured interviews were conducted with academic coordinators who are experts in the field in addition to the gathering of documents, thus using data triangulation to explore the phenomenon. The analysis of primary data and the analysis of documents from the Coordinating Agency for Advanced Training of Graduate Personnel (CAPES) served as inputs for analyzing and interpreting the results. As a result, we developed an adaptive project management model with the following characteristics: a) constant planning of activities, occurring in every cycle of interactions; b) iteration using short activities, allowing for more control of the project; c) validations performed continuously to ensure the goals proposed by CAPES are reached; and d) adaptable to change of scope during the execution phase of the project life cycle.